[1] Center for Chemical Process Safety (CCPS)., “Guidelines for Facility Siting and Layout”, American Institute of Chemical Engineers(AIChE),New York, pp. 1-50 (2003).2] Cozzani V., Bandini R., Basta C., Christou D., Application of Land-Use Planning Criteria for the Control of Major Accident Hazards: A Case-Study, Journal of Hazardous Materials., 136, p. 170 (2006).
[3] Bajpai S., Gupta J.P., Site Security for Chemical Process Industries, Journal of Loss Prevention in the Process Industries., 18, p. 301 (2005).
[4] Abdolhamidzadeh B., Rashtchian D., Ashouri E., A New Methodology for Frequency Estimation of Second or Higher Level Domino Accidents In Process Plants Using Mote Carlo Simulation, Iranian Journal of Chemistry and Chemical Engineering., 28, p. 21 (2008).
[5] Havens J., Spicer T., United StatesRegulations for Siting LNG Terminals: Problems and Potential, Journal of Hazardous Materials., 140, p. 439 (2007).
[6] Kaszniak M., Holmstrom D., Trailer Siting Issues: BP Texas City, Journal of Hazardous Materials., 159, p. 105 (2008).
[7] Marangon A., Carcassi M., Engebo A., Nilsen S., Safety Distances: Definition and Values, International Journal of Hydrogen Energy., 32, p. 2192 (2007).
[8] Taylor S.W., The Role of Consequence Modeling in LNG Facility Siting, Journal of Hazardous Materials, 142, p. 776 (2007).
[9] Center for Chemical Process Safety (CCPS), “Guidelines for Chemical Process Quantitative Risk Analysis”, 2nd ed., American Institute of Chemical Engineers (AIChE),New York, pp. 95-118 (2000).
[10] MedinaH., Arnolds J., Casal J., Process Design Optimization and Risk Analysis, Journal of Loss Prevention in the Process Industries, 22, p. 566 (2009).
[11] Rigas, F. and Sklavounos, S., Major Hazards Analysis for Populations Adjacent to Chemical Storage Facilities, Process Safety and Environmental Protection., 84, p. 1 (2004).
[12] Lees F.P., “Loss Prevention in the Process Industries”, 3rd ed, Butterworth-Heinemann,Oxford. pp. 853-952 (2005).
[13] Cheremisinoff, N.P., “Handbook of Hazardous Chemical Properties”, Butterworth-Heinemann,London, pp. 311-350 (2000).
[14] “CNG Station in F-6 Afire After Gas Cylinder Explosion”, Available from http://www.ParkTribune.com, Saturday, Nov. 04, (2006).
[15] “Blueline Gutted at CNG pump”,Chandigarh, India, Available from http://www.Tribuneindia.com, Thursday, Aug. 21, (2003).
[16] Xieqin, “High-Pressure Gas Storage at the Filling Station of Vehicle Compressed Natural Gas”, Tianranqi Gongye/Natural Gas Industry, 18, (1998).
[17] Communication with HSE Department, Gaz Khodro Company, National Iranian Gas Company (NIGC), (2010).
[18] Chung J.B., Kim H.K., Competition, Economic Benefits, Trust, And Risk Perception in Siting A Potentially Hazardous Facility, Landscape and Urban Planning., 91, p. 8 (2009).
[19] Ward P., Susan B., "Evaluation of Compressed Natural Gas (CNG) Fueling System",CaliforniaEnergy Commission, (1999).
[20] "Process Manual of Banihashem CNG Station", Greater Tehran Gas Company,Tehran,Iran, (2001).
[21] Center for Chemical Process Safety (CCPS), “Guidelines for Hazard Evaluation Procedures”, 3rd ed., AmericanInstituteofChemical Engineers(AIChE),New York, pp. 425-568 (2007).
[22] Center for Chemical Process Safety (CCPS), “Guidelines for Consequence Analysis of Chemical Releases”, American Institute of Chemical Engineers (AIChE), New York, pp. 108-215 (1999).
[23] Casal, J, “Evaluation of the Effects and Consequences of Major Accidents in Industrial Plants”, Elsevier,Oxford,UK, pp.185-211 (2008).
[24] Det Norske Veritas (DNV), Activity Responsible Function (ARF) Technical Library, Internal DNVReport,Norway, (1996).
[25] System and Reliability Research, “Fault Tree Handbook”,U.S.Nuclear Regulatory Commission, Washington, (1981).
[26] Center for Chemical Process Safety (CCPS), “Guidelines for Developing Quantitative Safety Risk Criteria”, American Institute of Chemical Engineers (AIChE), New York, pp. 298-305 (2009).
[27] Badri N., Nourai F., Rashtchian D., Quantitative Risk Assessment to Site CNG Refueling Stations, Chemical Engineering Transactions., 19, p. 255 (2010).
[28] Hirst I.L., Carter D.A., A Worst Case Methodology for Risk Assessment of Major Accident Installations, Process Safety Progress., 19, p. 2 (2000).
[29] Ball D.J., Floyd P.J., “Societal Risks, Final Report”, (1998).